Skip to main content
DELETE
Archive Change Order

Authorizations

X-API-KEY
string
header
required

Headers

Idempotency-Key
string

Optional. A unique value (a UUID works well) identifying this operation. If the request is repeated with the same key, the original response is replayed instead of the operation running again, so a retry cannot create a duplicate record. Results are replayable for 48 hours. Reusing a key with a different request body returns 422.

Maximum string length: 255

Path Parameters

contract_id
integer
required
change_order_id
integer
required

Response

OK

created_at
string<date-time>
required

Date and time the record was created

updated_at
string<date-time>
required

Date and time the record was last updated

success
boolean
default:true
errors
Errors · object
message
string | null